• 导出

  • 分享

  • 收藏

  • 专辑

Research on Construction Period Estimation Method for Hydropower Projects During Rainy Season Based on Monte Carlo Model

6卷 第8期

    浏览量: 0 Downloads: 0
    • Research on Construction Period Estimation Method for Hydropower Projects During Rainy Season Based on Monte Carlo Model

    • Research on Construction Period Estimation Method for Hydropower Projects During Rainy Season Based on Monte Carlo Model

    • 2025年6卷第8期 页码:95-99   

      纸质出版:2025-08-30

    • DOI:10.47297/taposatWSP2633-456918.20250608    

    Scan QR Code

  • (2025). Research on Construction Period Estimation Method for Hydropower Projects During Rainy Season Based on Monte Carlo Model. 科技理论与实践(英文版), 6(8), 95-99. DOI: 10.47297/taposatWSP2633-456918.20250608.

    Pan Jiale.Research on Construction Period Estimation Method for Hydropower Projects During Rainy Season Based on Monte Carlo Model[J].Theory and Practice of Science and Technology,2025,06(08):95-99. DOI: 10.47297/taposatWSP2633-456918.20250608.

  •  
  •  
文章被引用时,请邮件提醒。
Submit

Related Author

Dezhi Niu

Related Institution

Shaanxi University of Science & Technology, University Town, Weiyang District
0